d+b facades Case Study - University of Bradford Richmond Building

Tags: construction | refurbishment | refurbish | aluminium

Downloads

d+b facades Case Study - University of Bradford Richmond Building image #1

The first phase of the refurbishment of the Richmond Building was completed by d+b facades in 2005. Phase II comprised insulated aluminium rainscreen and high-performance replacement windows to further elevations of the building, refurbishment of the adjacent workshop building and the two link bridges joining the same. Additional works included standing seam roof coverings to the north lights of the workshop building and single ply to flat surfaces, replacement windows to the roof lights, aluminium sandwich panels to north light gable ends and a new glazed entrance.

d+b facades is an EAUC Company Member.